Jump directly to main navigation Jump directly to content

About the Zoning

Explains the zoning concept in relation to the heat load calculation according to SP 60.13330.2016.

Zoning is required by standard for all ground-adjoining walls and floors. At distances of two meters the components adjoining the ground are assigned to zones I to IV. Zone I adjoins the ground surface, and zone IV is the innermost test surface, which has a distance of more than six meters to the ground surface along the components adjoining the ground. With increasing number of the zone, a greater insulating effect is assumed to consider a non-uniform distribution of temperature in the ground. If a layer construction is available for a component adjoining the ground, an R-value is determined from the zone and the lambda value of the insulation according to standard. The determined R-value together with the U-value of the component result in the total U-value U(o). If no layer construction is available for the component adjoining the ground, an error is issued and the numerical U-value is used. You can deactivate the error message in the heat load options.