R1 Projectbureau from Russia

Since 2014, the specialists from the "R1 Projectbureau" have been using BIM: all projects in all phases are designed only in Autodesk Revit and Civil 3D. In February 2020 the company took another step towards integrated design and relied on LINEAR Solutions for technical calculations.

Currently two…

Revit Families in “Transformation of design phases”

An important module for exemplary planning according to the BIM methodology is development of the building model in stages. If architects have already been developing their methods for a long time, how “rough and ready” is succeeded by “refined and sophisticated”, the methods in the MEP are still…

Cooling load calculation part 3

Influence of climate on the cooling load calculation

Dynamic cooling load is comprised of external and internal loads. Whereas internal loads are heavily dependent on the use of the building, it is orientation, location, and architecture of the building that influence the external loads. In the…

Interview with the LINEAR development management

MEP journal "Integrale Planung" – Interview with Javier Castell Codesal and Dr. Christian Waluga from LINEAR

The political decision to make BIM mandatory in future has ultimately left service providers in the construction industry with no other choice for the long term. Even non-government clients…

The digital twin as the basis for optimisation

LINEAR is supporting the Russian general planner JSC “VNII Galurgii” in the implementation of BIM-compliant planning processes at the sites belonging to PJSC Uralkali, one of the world-leading potassium producers.