LINEAR Revit V26

Creating and Configuring a New Pipe Run

Shows step-by-step how to create and configure a new pipe run.

  1. Click on one of the buttons next to the button to create a new pipe run.

    A new, automatically named pipe run is created and there is now a separate, numbered button for the new pipe run below the field with the pipe run name.

  2. Click in the field with the pipe run name and enter a name for the new pipe run.

  3. Click on the colored line next to the pipe run name to specify the pipe/duct section data between the pipe runs.

    The Pipe run data dialog opens.

  4. Specify the Length of the pipe section between the pipe runs and the number of additional bends, if necessary.

  5. If the pipe material from the project settings is not to be used, deactivate the checkbox from project settings in the Nominal pipe sizes area and click Material to specify a different pipe material in the Pipe tables dialog.

  6. In the Nominal pipe sizes area, specify the nominal sizes for the pipes.

  7. In the scheme generator of the trade Waste water, specify the Pipe type of the section between the pipe runs.

  8. Confirm your entries with OK.

    The colored line for the section between the pipe runs is labeled with the specified values for the length of the pipe section and the number of additional bends.

The new pipe run has been created and configured.