Creating and Assigning a Control
Shows step-by-step how to create a closed-loop control system and assign it a control component.
Before you begin
You also want to work with the standard control components selected by the system manufacturer as a controller with a further control system (e.g. with a 24V controller for baths and showers).
Requirements:
-
You have the system, which includes the control components, with which you wish to work in the system preselection.
-
The rooms to which you want to assign the control are already designed with the system that contains the desired control component.
Navigate to
As the selectable control components are dependent on the selected system group, the controller can only be assigned a control component if the controller is assigned to a circuit.
Procedure
- Click on
below Heating/Cooling Generator. The Component or Component Group dialog opens.

- Select Closed-Loop Control, if need be adjust Number and Name and confirm with OK.
The closed-loop control is created.

- Select the Manifold, of the circuit(s) to which you want to assign the new controller, in the Pipe Run View.
- In the Heating Manifolds/Cooling Manifolds section, in the Controller column, assign the new closed-loop control to the relevant circuits.
The new control is assigned to the circuit.

- Select the new closed-loop control in the Pipe Run View.
- In the Closed-Loop Control section, click
. The Select a single room closed-loop control system dialog opens.

- Select the desired control components and confirm with OK.
Results
In your project, you have created a new closed loop control with the desired control components and assigned it to circuits.