Spring direct naar de hoofdnavigatie Spring direct naar inhoud

Editing General Concept Data

Shows step-by-step how to set the general concept data to suit your project.

Before you begin

You want to set the general concept data for creating the ventilation concept.

Navigate to:

Module overviewDomestic Ventilation Concept DIN 1946-6Project levelGeneral concept data

Procedure

  1. Activate the option for single-storey ventilation zones: with height difference between leakages and OAO in the Cross ventilation design area if you are planning cross ventilation with significant height differences between leakages and outside air outlets.
  2. Define the correction factor f position for cross and shaft ventilation in the Infiltration through the building envelope area in the Wind protection / Shielding drop-down list.
  3. Activate the option Measured air exchange rate values available if the air change rate is specified and measured values are available.
  4. Enter the Air change rate (n50) and the Pressure exponent.

Results

The basic concept data is set according to the planned ventilation concept.