LINEAR Revit V26

Selecting Construction Level and Offset

Shows step-by-step how to set the construction level on which you construct pipes, ducts, and components.

  1. Select the reference level.

  2. Select the datum level. If the datum level conforms to the reference level, select Current storey.

  3. Enter an offset to the datum level.

    If the component is to be located below the datum level, enter a negative offset.

If you construct pipes in a floor plan view, 3D view or an area plan, or if you insert components from the library tab, the set construction level is used as the height.