Specifying Project Settings

Shows step-by-step how to specify general settings for the pipe run construction and the pipe network calculation of your project.

Before you begin

You want to define project settings for the schematic design and the pipe network calculation of a trade.

Navigate to:

Module OverviewScheme Heating/Potable Water/Waste Water/Gas

Applies to Heating, Potable water, Waste water and Gas.

Scheme Linear Smartplan

Procedure

  1. Make sure that the project level is selected in the building structure so that the Settings button is visible.
  2. Click Settings.
  3. In the Settings area, define the desired default settings for the schematic design and the pipe network calculation of your project.

Results

You have defined the project settings for the schematic design and the pipe network calculation of a trade.