Jump directly to main navigation Jump directly to content

Details on “Adjust Storeys"

Information on the dialog Adjust storeys in connection with the workflow Scheme.

In this dialog, you have the possibility to check and adjust the values entered from the storey table before creating the scheme. The values in this dialog are determined on the basis of the information in the Storeys dialog. If changes have been made in the Storeys dialog, the changes are automatically applied upon reopening of this dialog, provided that the changes do not affect values that have already been changed in the Adjust Storeys dialog.
Note: All manual adjustments in this dialog only affect the scheme creation; values in the Storeys dialog are not changed. Manually adjusted values are also not overwritten with the values from the Storeys dialog.

You are here:

Project tabDisciplines ...Workflows: SchemeDesign Tab Adjust Storeys (Area: Convert Model to Scheme <)

“Adjust Storeys” Dialog in the Workflow Scheme in the LINEAR Solutions for Autodesk Revit

Building Parts

If the project contains building parts with different storey tables, you can use this drop-down list to select which storey table should be used to create the scheme.

Icons

– Opens a list of previously deleted storeys for recovery.

– Deletes the currently selected storey.

– Reverses all adjustments made in this dialog by retrieving all values and storeys from the Storeys dialog.

Name

The name of the storey is taken from the Storeys dialog and cannot be adjusted here.

Absolute Height

The absolute height is taken from the Storeys dialog and cannot be adjusted here.

Finished Floor

The height of the finished floor is shown as the distance between the top edge of the unfinished floor and the top edge of the finished floor. You can edit this value.

Suspended ceiling

The height of the suspended ceiling is shown as the distance between the lower edge of the suspended ceiling and the lower edge of the unfinished ceiling. You can edit this value.

Unfinished ceiling

The height of the unfinished ceiling is specified as the distance between the lower edge of the unfinished ceiling and the upper edge of the unfinished floor of the storey above. You can edit this value.

Storey height

The storey height is taken from the Storeys dialog and cannot be adjusted here.

Reference storey levels

Use the drop-down list to set the reference for the storey levels. You can choose between upper edge finished floor, upper edge unfinished floor (default setting) and bottom edge ceiling. The selection of the correct storey level is a prerequisite for the creation of a scheme.