Creating and Assigning a Control
Shows step-by-step how to create a closed-loop control system and assign it a control component.
Before you begin
You also want to work with the standard control components selected by the system manufacturer as a controller with a further control system (e.g. with a 24V controller for baths and showers).
Requirements:
-
You have the system, which includes the control components, with which you wish to work in the system preselection.
-
The rooms to which you want to assign the control are already designed with the system that contains the desired control component.
Navigate to:
As the selectable control components are dependent on the selected system group, the controller can only be assigned a control component if the controller is assigned to a circuit.
Procedure
- Click on
below Heating/Cooling Generator. The Component or Component Group dialog opens.

- Select Closed-Loop Control, if need be adjust Number and Name and confirm with OK.
The closed-loop control is created.

- Select the Manifold, of the circuit(s) to which you want to assign the new controller, in the Pipe Run View.
- In the Heating Manifolds/Cooling Manifolds section, in the Controller column, assign the new closed-loop control to the relevant circuits.
The new control is assigned to the circuit.

- Select the new closed-loop control in the Pipe Run View.
- In the Closed-Loop Control section, click
. The Select a single room closed-loop control system dialog opens.

- Select the desired control components and confirm with OK.
Results
In your project, you have created a new closed loop control with the desired control components and assigned it to circuits.