Specifying General Settings for Siphonic Drainage (Roof Drainage)
Shows step-by-step how to set general settings for the calculation.
Before you begin
You want to make sure that all parameters are set correctly before the calculation.
Navigate to
Applies to: Waste water (siphonic drainage).

Procedure
- Select the desired calculation method from the Method drop-down list.
- Check the values and limits in the left-hand area below the drop-down list and make any necessary adjustments to meet the requirements of your project.
- Activate the Zeta Values option if manufacturer material is assigned with measured values and the values are to be taken into account in the calculation.
- If possible, activate the option Dimension for Positive Residual Pressure if there are drains in the network that are located as far as possible in local low points (depressions).
- Close the dialog with a click on OK.
Results
The basic settings for the calculation have been defined and will be taken into account in the next calculation.