In the Settings you can make general default settings for the scheme construction and the pipe network calculation. The settings apply to the whole project. The Settings are only visible when you are in the Building Structure at storey or project level.

You are here:

Module OverviewScheme Potable WaterProject Level (Building Structure)Settings

Scheme potable water settings Linear Smartplan

Pipe Run Connection in the Intermediate Storeys

Collective Pipe Run Connection, Single Pipe Run Connection, Crossover T-Piece

Defines how the pipes are connected to the pipe run.

Type of pipe run connection Construction in the generated scheme
Collected Pipe Run Connection Scheme Potable Water Construction LINEAR Smartplan
Single Pipe Run Connection Scheme Potable Water Construction LINEAR Smartplan
Connection with Crossover T-piece Scheme Potable Water Construction LINEAR Smartplan

Material

Pipe Material ...: Opens the Pipe Tables dialog where you can specify the material for the entire pipe network.

Pipe Run Material...: Opens the Pipe Run Material dialog, where you can specify different pipe run material for the pipe run.

Basement Material...: Opens the Basement Material... dialog, where you can specify a different pipe material for the pipes in the basement.

Valves: Opens the Valves dialog where you can compile a valve preselection for the pipe network calculation.

Configuration...: Opens the Settings dialog, in which presettings for the pipe network calculation can be made.

Manufacturer Selection...: Opens the Manufacturer Selection dialog, in which you select a manufacturer to make its product data set available in the Pipe Tables dialog.

Connection of the Consumers

Connection looped in

Enabled: The cold and hot water pipes are connected looped in.

Figure 1. Display of looped in pipes in the pipe run scheme
Scheme Potable Water Construction LINEAR Smartplan

Type of Installation

Type of Installation

Drop-down list to select the type of installation.

When connecting the pipe to a symbol, a junction box is automatically drawn and provided with a suitable attribute depending on the type of installation (e.g. AP for surface-mounted and UP for flush-mounted). The selection of available installation types depends on the selected manufacturer (Manufacturer Selection dialog). Depending on the manufacturer and the type of installation, connection sets are compiled, whose materials are later included in the parts list of the pipe network calculation.

Figure 2. Display in Pipe Run Scheme: Wash Stand with Attributes for In-Wall Installation
Scheme Potable Water Construction LINEAR Smartplan

Circulation Valves

Pipe Run

Defines whether thermostatic or static valves are used in the pipes for the pipe network calculation.

In the Material section of the Settings, click Valves... to define specific manufacturer valves for the calculation in the Valves dialog.

Storey

Defines whether thermostatic or static valves are used in the pipes for the swan network calculation.

In the Material section of the Settings, click Valves... to define specific manufacturer valves for the calculation in the Valves dialog.

Plot

Distance between Consumers

Sets the clear distance between the consumers in the scheme.

Text Height

Sets the text height of the label.

Show Sheet Format

Enabled: The scheme is given a sheet frame including title block.

Label Consumer

Enabled: The consumers are labeled with the flow path number, mass flow, rate, capacity, and valve setting. The consumers are labeled only when the scheme is generated as a labeled plan. If you have selected w/o Labeling, consumers are also not labeled.